Live demo · Signs

Talk to an AI receptionist for a sign shop.

We set this one up as a sample sign installation and fabrication shop, made up just for this demo. Talk to it like a customer: say you just opened a business and need a sign over the door, ask about a site survey, or say half the letters on your building sign are out. Or call as a national sign company that needs a local installer. It’s the same technology your callers would hear, set up for a different business.

Try it now

Tap "Tap to talk" at the bottom right and allow mic access. She'll greet you as soon as you do, and then you can just talk like a customer.

Turn your volume up. On an iPhone, flip the ringer switch off silent. Typing in the box instead gets you text replies only.

Things to try

  • I just opened a business and I need a sign over the front.
  • How much does a site survey cost?
  • Half the letters on our building sign are out.
  • We’re a national sign company looking for an installer in your area.
  • I bought a sign online. Will you install it?
  • Am I talking to a real person?

What it’s working from

Local site surveyStarts at $125
Sign service call$149
Simple installation minimum$225
Channel letters, cabinets, monumentsProject estimate
Lift or bucket truck installsReviewed first

Fictional demo pricing for illustration only. The AI quotes only the approved prices above and never prices a complex install without site information. For your business, we load in your real price list.

What happens behind the scenes

  1. It works out whether the call is a new sign, an install-only job, a repair, a removal, graphics, or a survey, and asks only the questions that fit.
  2. It asks for height, access, mounting surface, electrical and permit status, so an estimator isn’t starting from zero.
  3. For a national sign company it switches to trade language and captures the work order number, drawings, and photo closeout requirements.
  4. It never diagnoses a lighting problem and sends safety hazards to a human right away.
  5. In a real setup, the project summary, tags like SIGN-Channel-Letters, and the survey or service appointment land in front of the owner right away.

Want one set up for your business?

We’ll build it around your services, prices, hours, and service area, then walk you through it before it ever answers a real call.