MPS Content — Smarter Contents Inventory & Documentation
A standalone MPS application for restoration contractors, contents technicians, and property damage documentation. Build a clean inventory by job and room, mark what is salvageable, and export a spreadsheet your adjuster and your team can open.
MPS Content has its own sign-in and is currently a test version. Features still being built are labeled below. How access works
Contents documentation, organized the way jobs actually run
These are the intended capabilities of MPS Content. The next section shows exactly which are in the current test version and which are still in development.
Inventory by job and room
A digital contents inventory organized by job and room, so every item has a home and nothing gets counted twice.
Salvageable and unsalvageable tracking
Sort items into salvageable, unsalvageable, or pending as decisions are made on site.
Item details
Descriptions, quantities, brands, models, and serial numbers captured for each item.
Damage and condition
Document the damage observed and the condition of each item to support the claim file.
Replacement value
Track replacement value per item so totals roll up without retyping.
Spreadsheet export
Exports compatible with Excel and Google Sheets for adjusters, owners, and your own records.
Built for the field
MPS Content is designed as a mobile-friendly workflow for field technicians, so inventory can be entered from a phone or tablet at the job site.
What works today, and what is still being built
MPS Content is a test version. Only the features in the left column are available now. Nothing in the right column should be relied on yet.
Current test version
- Manual inventory entry — type in each item with its room, quantity, brand, model, serial number, and damage notes.
- Job organization — create jobs by customer and claim number and keep each job's inventory separate.
- Item classification — mark items salvageable, unsalvageable, or pending.
- Verified replacement-cost entry — enter replacement costs you have verified yourself.
- CSV export — download a spreadsheet file that opens in Excel or uploads to Google Sheets.
Not available yet
- AI photo identification — suggesting an item description from a photo.
- Automatic serial-number extraction — reading serial numbers from label photos.
- AI-assisted replacement pricing — suggested pricing research for you to review.
- Persistent photo attachments — photos saved with each item.
- Direct Google Drive synchronization — automatic saving to Drive. For now, download the CSV and upload it yourself.
Why we label this so carefully
Restoration documentation gets read by carriers and adjusters. We would rather tell you plainly what the software does today than have you assume a photo was saved or a price was checked when it was not.
Made for people who document losses
Restoration contractors
Keep a defensible contents record for water, fire, and smoke jobs without juggling loose spreadsheets.
Contents technicians
Walk a home room by room, classify what you see, and leave with a file you can hand off.
Property damage documentation
Produce an organized inventory with replacement values for owners, adjusters, and project managers.
Open the application
MPS Content is a separate application with its own secure sign-in. This website does not collect passwords, and there is no public sign-up. If you do not have an account yet, ask us about access.
The “Open MPS Content” button takes you to the sign-in page of the application. A dedicated MPS Content web address may be added in the future; this page will always link to the current one.
MPS Content FAQ
What is MPS Content?
MPS Content is a standalone application from McAdams Project Services for documenting contents inventory on restoration and property damage jobs. Items are organized by job and room, classified as salvageable, unsalvageable or pending, and exported to a spreadsheet.
What can MPS Content do today?
The current test version supports manual inventory entry, job organization, item classification, verified replacement-cost entry and CSV export that opens in Excel or Google Sheets.
Does MPS Content use AI to identify items from photos?
Not yet. AI photo identification, automatic serial-number extraction, AI-assisted replacement pricing, persistent photo attachments and direct Google Drive synchronization are under development and are not part of the current test version.
How do I get access to MPS Content?
MPS Content manages its own sign-in and does not offer public registration. Contact McAdams Project Services to ask about access.
Can I open the exported inventory in Excel or Google Sheets?
Yes. The export is a CSV file that opens in Excel and can be uploaded to Google Sheets. Automatic Google Drive saving is not yet available.
Want to see it for your jobs?
Tell us how you document contents today and we will tell you honestly whether MPS Content fits yet.
MPS also builds the AI Front Desk for restoration contractors.