How Much Does an AI Receptionist Cost for a Contractor?
The common pricing models
- Flat monthly plan. One price, predictable. Check what is included and what counts as a limit.
- Included calls or minutes plus overage. Cheap in a quiet month, expensive in a storm-damage or cold-snap month.
- Per call or per minute. Fair for low volume, hard to budget for high volume.
- Setup fee. A one-time charge for configuring the system around your business. Some providers skip it and push the work onto you.
What to ask before you sign
- What is my total cost in a normal month and in my busiest month?
- Is there a setup fee, and who does the setup: you or the provider?
- Is there a long-term contract or a cancellation fee?
- Can I keep my existing phone number?
- What happens to emergencies and calls that need a person?
- Does it log leads to a CRM and book appointments, or only take messages?
- Will callers be told they are speaking with an automated assistant?
MPS AI Front Desk pricing
| Plan | Monthly | Setup |
|---|---|---|
| Front Desk | $149 | $199 |
| Conversion | $299 | $399 |
| Complete | $449 | $799 |
Each plan includes everything in the one below it. A website build and website visitor tracking are in Complete only. All plans are month-to-month with no long-term contract. See the full pricing page.
Is it worth it?
The question is not "what does it cost" but "what does it cost compared with the jobs it saves." A simple test:
- Estimate how many new-customer calls you miss in a month.
- Multiply by the share that would have booked.
- Multiply by your average job value.
- Compare the result to the monthly price.
Illustrative example: if you miss 20 new-customer calls a month, a quarter of them would have booked, and your average job is $600, that is about $3,000 a month in work you did not get. If your numbers are much smaller, the math may not work yet, and that is useful to know. Run your own numbers in the calculator.
Call our live AI Front Desk
Call (814) 301-4611 to talk to the same kind of AI front desk we set up for contractors, or book a free 30-minute walkthrough and get a plan recommendation.
Book a free demoFrequently asked questions
Is there a long-term contract?
Not with MPS. All plans are month-to-month.
Is there a cheaper way to start?
The Front Desk plan is the starting point at $149/month plus a $199 setup, and it is month-to-month, so there is no long-term commitment.
Do I need the Complete plan?
Only if you also want a website and an ongoing marketing system. If your problem is missed calls, the Front Desk plan is the place to start.
This guide is general information for small service businesses. Examples are illustrative, not guarantees of results.