McAdams Project ServicesMcAdams Project ServicesMPS AI Front Desk
Free Resource

30 Practical AI Prompts for Contractors & Home-Service Businesses

Copy-and-paste prompts for examining your pricing, profit, lead response, scheduling, and day-to-day operations.

Built for small, owner-led contractors and home-service businesses.

Download the Free PDFRead the prompts below

45-page PDF with all 30 prompts · Free · No account required

Not a list of clever prompts.

These are not generic ChatGPT prompts. Each one is built to help you examine a specific part of your business and decide what to improve. Between them, the 30 prompts help you look at:

PricingProfitabilityCash flowMarketingLead responseSales follow-upSchedulingField operationsHiringCustomer retentionWebsite performanceAutomationBusiness bottlenecksJob documentationJob costing
Read this first

Give AI the facts; don't let it create the facts.

If information is missing, tell the AI to identify what is missing rather than guess.

Do not rely on AI to invent:

  • Prices
  • Quantities
  • Measurements
  • Customer information
  • Building-code requirements
  • Licensing requirements
  • Permit requirements
  • Warranties
  • Technical findings
  • Safety requirements
  • Market statistics
  • Financial facts
  • Legal conclusions

Financial, safety, regulatory, technical, contractual, and customer-facing information should be reviewed by a qualified human before it is relied upon.

How to use them

1. Copy the prompt

Every prompt has its own COPY PROMPT button. Use only the ones that fit your business today.

2. Fill in the [brackets]

Replace each highlighted field with your real numbers and details. Leave nothing to guess.

3. Review before you rely on it

Treat the answer as a draft. Check the numbers and have a qualified person review anything financial, legal, safety-related, or customer-facing.

Jump to a section

Section 1

Pricing, Profit & Cash Flow

Prompt 1

Find Out Whether My Pricing Actually Makes Money

Replace each highlighted [field]
Act as a financial and operations advisor for a small home-service business.

My company provides:

[SERVICES]

Our typical hourly wage for field employees is:

[$]

Our approximate payroll burden, workers' compensation, benefits, payroll taxes, and related labor costs are:

[% OR ESTIMATE]

Our monthly overhead is approximately:

[$]

We have approximately:

[NUMBER]

billable field employees.

Our average billable hours per technician per week are:

[HOURS]

Our current labor rate charged to customers is:

[$]

Analyze whether our current labor rate appears sufficient to cover:

- Direct labor
- Payroll burden
- Overhead
- Non-billable time
- Reasonable profit

Estimate:

1. True hourly labor cost
2. Approximate break-even hourly rate
3. Recommended minimum billing rate
4. Suggested target rate at 10% net profit
5. Suggested target rate at 15% net profit
6. Suggested target rate at 20% net profit
7. The biggest assumptions affecting the calculation

Do not invent expenses I have not provided.

If important information is missing, identify it.

Finish by telling me what financial information I should collect to make this calculation more accurate.
Prompt 2

Analyze My Most and Least Profitable Services

Replace each highlighted [field]
Act as a profitability advisor for a small contractor or home-service company.

My company provides:

[LIST SERVICES]

For each service I can provide as much of the following as I know:

- Average selling price
- Average labor hours
- Average labor cost
- Average material cost
- Average subcontractor cost
- Average equipment cost
- Typical travel
- Typical callback or warranty cost
- Frequency of the service
- Any recurring or repeat-business opportunity

Analyze the relative profitability of each service.

Rank them based on:

1. Gross-profit potential
2. Labor efficiency
3. Scheduling difficulty
4. Material exposure
5. Callback/warranty risk
6. Upsell potential
7. Repeat-business potential
8. Operational complexity

Identify which services I should consider:

- Promoting more aggressively
- Repricing
- Packaging differently
- Improving operationally
- Reducing
- Potentially discontinuing

Do not invent numbers that I have not supplied.

Clearly identify where more data is needed.
Prompt 3

Build Good / Better / Best Pricing

Replace each highlighted [field]
Act as a pricing and customer-experience consultant.

Create a Good / Better / Best pricing structure for:

[SERVICE]

My current typical price is:

[$]

My typical customer is:

[CUSTOMER TYPE]

Our competitive advantages are:

[ADVANTAGES]

The things customers usually care about most are:

[PRICE / SPEED / WARRANTY / QUALITY / CONVENIENCE / OTHER]

Create three genuinely differentiated service options.

For each option provide:

- Package name
- Who it is best for
- What is included
- What is not included
- Customer benefit
- Suggested pricing position
- Possible add-ons
- How an employee should explain the option to the customer

Do not use manipulative sales tactics or fake urgency.

Do not invent actual pricing unless I ask you to calculate it from data I provide.
Prompt 4

Find Where Money Is Getting Stuck

Replace each highlighted [field]
Act as a small-business cash-flow analyst.

Here is how our company currently bills and gets paid:

[DESCRIBE PROCESS]

Average invoice amount:

[$]

Average time from job completion to invoice:

[DAYS]

Average time from invoice to payment:

[DAYS]

Current accounts receivable:

[$]

Invoices more than 30 days old:

[$]

Invoices more than 60 days old:

[$]

Invoices more than 90 days old:

[$]

We currently accept:

[PAYMENT METHODS]

Analyze where money may be getting stuck.

Review:

- Deposits
- Progress billing
- Final invoicing
- Invoice timing
- Payment terms
- Customer reminders
- Collections
- Credit cards
- ACH
- Financing
- Customer communication
- Internal administrative delays

Rank your recommendations by:

1. Likely impact
2. Ease of implementation
3. Cost
4. Customer impact

Do not provide legal or financial advice.

Flag any area that should be reviewed by an accountant, attorney, or other qualified professional.
Prompt 5

Build an Accounts Receivable Follow-Up System

Replace each highlighted [field]
Build a professional accounts-receivable follow-up workflow for my:

[TYPE OF CONTRACTOR]

Our normal payment terms are:

[TERMS]

Our customers are typically:

[RESIDENTIAL / COMMERCIAL / BOTH]

Create a sequence beginning when an invoice becomes due.

Include appropriate communication at:

- Due date
- 3 days overdue
- 7 days overdue
- 14 days overdue
- 30 days overdue
- Final manual-review escalation

For each stage recommend:

- SMS, email, phone, or manual action
- Purpose
- Suggested wording
- Who should be responsible
- When automation should stop

Keep the communication professional and respectful.

Do not create threats, legal claims, collection fees, or contractual penalties unless I specifically provide the applicable terms and tell you they have been legally reviewed.
Section 2

Marketing & Growth

Prompt 6

Find My Best Local Marketing Opportunities

Replace each highlighted [field]
Act as a local marketing strategist for a:

[TRADE]

company serving:

[CITIES / COUNTIES / SERVICE AREA]

Our primary services are:

[SERVICES]

Our ideal customers are:

[CUSTOMERS]

Our approximate average job value is:

[$]

Our current marketing channels are:

[CHANNELS]

Our current lead sources are:

[LEAD SOURCES]

Recommend the 10 strongest marketing opportunities for this specific business.

Consider:

- Google Business Profile
- Local SEO
- Website
- Facebook
- Instagram
- Google Ads
- Referral programs
- Realtors
- Property managers
- Commercial relationships
- Community organizations
- Partnerships
- Customer reactivation
- Email
- SMS
- Direct mail
- Local sponsorships

Rank each opportunity based on:

- Expected cost
- Difficulty
- Speed to results
- Ability to measure results
- Fit for my business

Do not invent local market statistics.

If current local research would be required, tell me exactly what should be researched.
Prompt 7

Find Underserved Services in My Market

Replace each highlighted [field]
Act as a business-development strategist.

I operate a:

[TRADE / SERVICE BUSINESS]

serving:

[LOCATION]

We currently provide:

[SERVICES]

Our strongest capabilities are:

[SKILLS / EQUIPMENT / CERTIFICATIONS]

Identify adjacent services or customer problems that a business like mine may be able to address.

Prioritize opportunities that:

- Use capabilities we already have
- Require limited new overhead
- Could create recurring revenue
- Could produce repeat customers
- Could lead to larger projects
- Complement our existing services

Give me up to 10 opportunities.

For each explain:

- Why it fits
- Likely customer
- Operational requirements
- Additional training or credentials that may be needed
- Revenue model
- Risks
- What should be verified locally before offering it

Do not assume licensing, permitting, certification, or insurance requirements.

Flag those for verification.
Prompt 8

Build a 30-Day Local Content Plan

Replace each highlighted [field]
Create a 30-day social-media content plan for my:

[TRADE]

business.

Business name:

[NAME]

Service area:

[LOCATION]

Primary services:

[SERVICES]

Ideal customers:

[CUSTOMERS]

Brand personality:

[FRIENDLY / PROFESSIONAL / LOCAL / TECHNICAL / OTHER]

Create a practical mix of:

- Educational posts
- FAQs
- Before-and-after ideas
- Seasonal reminders
- Customer-review content
- Employee/team content
- Community content
- Service explanations
- Problem/solution posts
- Behind-the-scenes content
- Offers
- Calls to action

Do not make every post promotional.

For each post provide:

1. Topic
2. Suggested caption
3. Photo/video idea
4. Call to action
5. Recommended platform

Do not invent customer testimonials, completed projects, staff information, certifications, or business claims.

Use placeholders where real business information is required.
Section 3

Lead Response & Sales

Prompt 9

Calculate What Missed Calls May Be Costing Me

Replace each highlighted [field]
Help me estimate the potential financial impact of unanswered calls and slow lead response.

My company receives approximately:

[NUMBER]

new inbound calls or leads per month.

Approximately:

[%]

are unanswered, delayed, or go to voicemail.

Our approximate close rate on qualified leads is:

[%]

Our average job value is:

[$]

Our approximate gross-profit margin is:

[%]

Using only these assumptions, estimate:

- Monthly revenue opportunity associated with missed leads
- Annual revenue opportunity
- Approximate gross-profit opportunity

Then model what could happen if we successfully recovered:

- 25%
- 50%
- 75%

of the missed opportunities.

Clearly distinguish between:

**Potential opportunity**

and

**Guaranteed revenue**

Do not claim that every missed call would have become a sale.

Show every assumption.
Prompt 10

Build My New Lead Response Workflow

Replace each highlighted [field]
Design a complete new-lead response workflow for a:

[TRADE]

company.

Leads can arrive from:

[PHONE / WEBSITE / GOOGLE / FACEBOOK / TEXT / REFERRAL / OTHER]

Office hours:

[HOURS]

Service area:

[AREA]

Emergency or urgent services:

[LIST]

Normal services:

[LIST]

Design what should happen during:

- First 60 seconds
- First 5 minutes
- First 15 minutes
- First hour
- Same day
- Following 3 days

Include where appropriate:

- SMS
- Phone call
- Email
- Qualification
- Appointment booking
- Human escalation
- CRM update
- Lost-lead tracking
- After-hours handling

Identify which actions can reasonably be automated and which should remain human-controlled.

The goal is fast, useful response without spamming the prospect.
Prompt 11

Build My Lead Qualification Script

Replace each highlighted [field]
Create a conversational lead-qualification script for my:

[TYPE OF BUSINESS]

We provide:

[SERVICES]

We serve:

[AREA]

Typical projects range from approximately:

[$]

to:

[$]

Create questions that determine:

- Customer name
- Contact information
- Property or service address
- Service requested
- Urgency
- Description of the problem
- Property type
- Decision-maker status
- Insurance involvement when relevant
- Budget considerations when appropriate
- Scheduling availability
- Service-area fit
- Whether the project fits our capabilities

Separate questions into:

### Essential

### Useful

### Ask Only When Relevant

Then create:

- A natural opening
- A transition into scheduling
- A human-escalation trigger
- A polite decline/escalation response when the project does not fit

Keep it conversational rather than making the customer feel interrogated.
Prompt 12

Build an Estimate Follow-Up Sequence

Replace each highlighted [field]
My company sends approximately:

[NUMBER]

estimates each month.

Average estimate value:

[$]

Approximate current close rate:

[%]

Our normal sales cycle is:

[DAYS/WEEKS]

Create an estimate follow-up sequence beginning when the estimate is delivered.

Include:

- Same-day confirmation
- 2-day follow-up
- 5-day follow-up
- 10-day follow-up
- 21-day follow-up
- Long-term nurture when appropriate

Recommend an appropriate mix of:

- SMS
- Email
- Phone
- Manual salesperson/owner contact

For each touchpoint explain the goal.

The communication should help the customer make a decision without pressure or fake urgency.

Identify when the opportunity should become:

- Won
- Lost
- Nurture
- Needs human review
Prompt 13

Analyze Why My Estimates Are Not Closing

Replace each highlighted [field]
Act as a sales-process analyst for a contractor or home-service company.

Here is information about my last:

[NUMBER]

estimates:

[PASTE DATA, NOTES, OUTCOMES, OR SUMMARIZE]

Analyze potential patterns behind lost work.

Look specifically at:

- Price
- Response time
- Financing
- Scope clarity
- Estimate presentation
- Scheduling delay
- Competition
- Trust
- Follow-up
- Service area
- Job size
- Lead quality
- Customer expectations

Separate possible problems into:

### Pricing Problems

### Sales-Process Problems

### Operational Problems

### Marketing / Lead-Quality Problems

### Insufficient Information

Recommend the five highest-impact improvements.

Do not assume a lost job was caused by price unless the evidence supports that conclusion.
Section 4

Scheduling & Field Operations

Prompt 14

Improve My Scheduling Process

Replace each highlighted [field]
Act as a dispatch and field-service operations consultant.

My company has:

[NUMBER]

field employees.

Normal work hours:

[HOURS]

Service area:

[LOCATIONS]

Services performed:

[SERVICES]

Average jobs per technician per day:

[NUMBER]

Emergency calls occur approximately:

[FREQUENCY]

Our biggest scheduling problems are:

[DESCRIBE]

Design an improved scheduling framework that considers:

- Technician skills
- Geography
- Job duration
- Urgency
- Emergency capacity
- Drive time
- Parts/material availability
- Customer availability
- High-value jobs
- Return visits
- Schedule buffers

Identify:

- What should be standardized
- What could be automated
- What should remain a human dispatch decision
- What information must be captured before scheduling
Prompt 15

Reduce Windshield Time

Replace each highlighted [field]
Act as a routing and field-efficiency consultant.

My technicians regularly work throughout:

[LIST SERVICE AREAS]

Our normal starting locations are:

[LOCATIONS]

Typical jobs last:

[DURATION]

Typical number of daily stops:

[NUMBER]

Emergency work occurs:

[FREQUENCY]

Create a routing and scheduling strategy that reduces unnecessary travel without sacrificing customer service.

Consider:

- Geographic service zones
- Scheduling windows
- Dispatch rules
- Technician territories
- Emergency exceptions
- Dedicated days for distant areas
- Start/end locations
- Return trips

Recommend data we should track to measure:

- Drive time
- Productive time
- Revenue per route/day
- Repeat trips
- Schedule efficiency

Do not assume routes or distances that I haven't supplied.
Section 5

People & Management

Prompt 16

Determine When I Should Hire

Replace each highlighted [field]
Act as an operations and financial advisor.

My company currently has:

[NUMBER]

field employees and:

[NUMBER]

office employees.

Average weekly or monthly revenue:

[$]

Average backlog:

[DAYS / WEEKS]

Average overtime:

[HOURS]

Average lead volume:

[NUMBER]

Technician utilization, if known:

[%]

Biggest operational bottlenecks:

[DESCRIBE]

Determine whether my next hire is more likely to be:

- Field technician
- Apprentice/helper
- Dispatcher
- Customer service representative
- Estimator
- Salesperson
- Project manager
- Administrative assistant
- No hire yet

For each realistic option explain:

- What business signal supports hiring
- What problem the role solves
- Potential financial considerations
- What should be measured before hiring

Then recommend the role that appears to deserve investigation first.

Do not claim I can afford a hire without sufficient financial information.
Prompt 17

Build an Employee Scorecard

Replace each highlighted [field]
Create a simple performance scorecard for a:

[TECHNICIAN / CSR / DISPATCHER / SALESPERSON / PM / OTHER]

at a:

[TRADE]

company.

The scorecard should contain no more than 8–10 meaningful metrics.

Potential areas include:

- Productivity
- Customer experience
- Quality
- Safety
- Documentation
- Attendance/reliability
- Communication
- Revenue where appropriate
- Follow-up
- Callback/rework rate

For every metric explain:

- What is measured
- Why it matters
- How often to review it
- Whether it should be an individual metric or team metric

Avoid metrics that encourage employees to sacrifice:

- Safety
- Quality
- Customer service
- Documentation

simply to work faster.
Section 6

Reviews, Retention & Referrals

Prompt 18

Build a Review Generation System

Replace each highlighted [field]
Design a compliant review-request workflow for my:

[TRADE]

business.

Customers should be asked for an honest Google review after successful job completion.

Create a workflow that includes:

- Job-completion trigger
- Appropriate delay
- First SMS
- Email fallback
- Reminder
- Duplicate protection
- Opt-out handling
- Dissatisfied-customer escalation
- Internal follow-up

The workflow must not:

- Manufacture reviews
- Reward only positive reviews
- Prevent unhappy customers from leaving legitimate reviews
- Misrepresent customer feedback

Also recommend what should happen internally when a customer indicates dissatisfaction.
Prompt 19

Reactivate Old Customers

Replace each highlighted [field]
I have approximately:

[NUMBER]

previous customers.

My company provides:

[SERVICES]

Typical customer lifecycle:

[DESCRIBE]

Create five customer-reactivation campaigns using the existing customer database.

Possible campaigns may include:

- Seasonal service
- Maintenance
- Inspection/checkup
- Related services
- Customer anniversaries
- Referral opportunities
- Preventative service
- Newly added services

For each campaign provide:

- Target customer segment
- Reason to contact them
- Offer or message
- SMS concept
- Email concept
- Timing
- Call to action

Avoid excessive discounting.

Do not recommend contacting customers without considering applicable consent and communication rules.
Prompt 20

Create a Referral Program

Replace each highlighted [field]
Design a referral program for a local:

[TRADE]

company.

Average job value:

[$]

Approximate customer acquisition cost, if known:

[$]

Typical gross margin:

[%]

Create three possible models:

1. Simple customer referral
2. Customer loyalty/referral model
3. Strategic partner referral model

For each explain:

- Incentive
- Who qualifies
- Tracking method
- When the reward is earned
- When it is issued
- Fraud/abuse controls
- Approximate economics
- Administrative requirements

Recommend which approach best fits a small local contractor.

Flag any industry-specific rules that may need verification before paying referral compensation.
Section 7

Website & Local Search

Prompt 21

Audit My Website Like a Customer

Replace each highlighted [field]
Act as a conversion specialist for local service businesses.

Here is my website or website content:

[URL OR PASTE CONTENT]

Evaluate whether a potential customer can quickly determine:

- What we do
- Where we work
- Who we help
- Why they should trust us
- How to contact us
- How quickly we respond
- Whether we solve their problem
- What they should do next

Evaluate:

- Homepage
- Service pages
- Calls to action
- Phone visibility
- Forms
- Booking
- Trust signals
- Reviews
- Service-area information
- Mobile experience
- Lead capture
- Professional email/contact information

Score each area from 1–10 based only on evidence available.

Then provide a prioritized improvement list:

### Fix First

### Fix Next

### Nice to Have

Do not invent information that is not visible.
Prompt 22

Build Local Service Pages

Replace each highlighted [field]
My business is:

[BUSINESS]

Primary services:

[SERVICES]

We serve:

[LIST TOWNS / CITIES / COUNTIES]

Act as a local SEO content strategist.

Identify which locations may justify dedicated pages and which should reasonably be grouped.

For important locations recommend:

- Page title
- Primary service topic
- Related services
- Useful local information
- FAQs
- Customer concerns
- Internal links
- Call to action
- What proof or local information the company should provide

Avoid thin pages where only the location name changes.

Do not invent jobs completed, office locations, testimonials, service coverage, or local statistics.
Section 8

Automation & Business Diagnosis

Prompt 23

Find Administrative Work That Should Be Automated

Replace each highlighted [field]
Act as an operations-automation consultant for a small service business.

Here are repetitive tasks my company currently performs:

[LIST TASKS]

Analyze each task and classify it as:

### AUTOMATE

### AI-ASSISTED

### HUMAN REQUIRED

### ELIMINATE

Consider work such as:

- Phone answering
- Lead intake
- Appointment booking
- Reminders
- Estimate follow-up
- Review requests
- Invoice reminders
- CRM updates
- Customer updates
- Reporting
- Data entry
- Email
- Customer questions
- Marketing administration

For each automation opportunity estimate qualitatively:

- Potential labor savings
- Customer impact
- Revenue impact
- Complexity
- Risk
- Implementation priority

Rank the five strongest opportunities.

Do not recommend automating a process merely because technology exists.

If the underlying process is unclear or broken, recommend fixing the process first.
Prompt 24

Find the Bottleneck in My Business

Replace each highlighted [field]
Act as a fractional operations manager for my service company.

Here is how a customer currently moves through our company:

[DESCRIBE CUSTOMER JOURNEY]

Here are our major problems:

[LIST PROBLEMS]

Our team consists of:

[TEAM]

Our software includes:

[SOFTWARE]

Our major lead sources are:

[LEAD SOURCES]

Analyze the operation from:

**Lead → Contact → Qualification → Estimate → Follow-Up → Scheduling → Job → Completion → Invoice → Payment → Review → Repeat Customer**

Identify the major bottlenecks.

For each bottleneck explain:

- What appears to be happening
- Evidence supporting that conclusion
- Why it matters
- Possible revenue impact
- Possible customer impact
- Possible labor impact
- Recommended process improvement
- Whether people, process, software, AI, or some combination is likely involved

Do not manufacture financial impact when data is unavailable.

Finish by identifying:

### THE SINGLE BOTTLENECK I SHOULD INVESTIGATE OR FIX FIRST

Explain why it should come before the others.
Prompt 25

Build My 90-Day Business Improvement Plan

Replace each highlighted [field]
Act as a fractional COO, marketing strategist, and automation consultant for my service business.

Company:

[NAME]

Trade:

[TRADE]

Location/service area:

[AREA]

Years in business:

[YEARS]

Employees:

[NUMBER]

Approximate annual revenue:

[$]

Average job value:

[$]

Top services:

[SERVICES]

Current lead sources:

[LEAD SOURCES]

Monthly lead volume:

[NUMBER]

Approximate close rate:

[%]

Current software:

[SOFTWARE]

Biggest problems:

[PROBLEMS]

Goals for the next 12 months:

[GOALS]

Identify the five biggest opportunities to improve:

- Revenue
- Profitability
- Efficiency
- Customer experience
- Operational consistency

Rank the opportunities based on:

- Revenue impact
- Profit impact
- Labor impact
- Customer impact
- Implementation cost
- Difficulty
- Speed to meaningful results

Then create a practical 90-day plan.

## FIRST 30 DAYS

Focus on:

- Immediate problems
- Revenue leakage
- Quick wins
- Missing processes
- Basic measurements

## DAYS 31–60

Focus on:

- Lead conversion
- Scheduling
- Follow-up
- Customer communication
- Operational consistency

## DAYS 61–90

Focus on:

- Scalable automation
- Reporting
- Marketing systems
- Management processes
- Continuous improvement

Then identify the five strongest automation candidates.

For each identify:

- Current problem
- Proposed approach
- Where a human should remain involved
- Expected benefit
- Implementation complexity
- KPI to track
- ROI potential: Low / Medium / High

Do not invent an ROI dollar amount without sufficient data.

Finish with:

### THE ONE CHANGE I SHOULD MAKE THIS WEEK

Choose the action most likely to materially improve the business or provide the information needed to make the next decision.

You Found the Questions. Now Find the Bottleneck.

Prompts can show you where to look. If you suspect a problem but are not sure which one deserves attention first, start with the free MPS Business Bottleneck Assessment.

It helps you identify the operational constraint that should be addressed first and receive practical next-step recommendations. No purchase is required to complete it.

Take the Free Assessment
Bonus

Bonus: AI for Running the Actual Job

Prompt 26

Turn My Walkthrough or Field Notes into a Clear Scope of Work

Replace each highlighted [field]
Act as a project documentation assistant for a contractor.

I will provide rough field information such as:

- Walkthrough notes
- Technician notes
- Measurements
- Customer comments
- Observed conditions
- Photos described in text
- Voice-transcript notes
- Known material requirements

My field information is:

[PASTE FIELD NOTES]

Turn the information into a structured draft scope of work.

Organize it into:

### PROJECT OVERVIEW

### WORK AREAS

### PROPOSED WORK

### KNOWN QUANTITIES

### MATERIALS OR SYSTEMS IDENTIFIED

### CUSTOMER RESPONSIBILITIES

### CONTRACTOR RESPONSIBILITIES

### INCLUSIONS

### EXCLUSIONS

### ASSUMPTIONS

### QUESTIONS THAT MUST BE ANSWERED BEFORE FINALIZING

### PHOTOS OR DOCUMENTATION THAT SHOULD BE CAPTURED

Never invent:

- Measurements
- Quantities
- Materials
- Code requirements
- Hidden conditions
- Pricing
- Customer approvals

If a fact is missing, label it:

**NEEDS VERIFICATION**

The result is a draft for contractor review, not a final contract.
Prompt 27

Turn an Unexpected Condition into a Professional Change Order

Replace each highlighted [field]
Act as a project-documentation assistant.

Original agreed scope:

[ORIGINAL SCOPE]

Unexpected condition discovered:

[CONDITION]

Why the original work cannot proceed as planned:

[EXPLANATION]

Additional work believed to be necessary:

[WORK]

Contractor-provided additional price:

[$]

Potential schedule impact:

[DAYS / DESCRIPTION]

Evidence available:

[PHOTOS / NOTES / MEASUREMENTS]

Create a clear draft change-order description containing:

### ORIGINAL SCOPE

### CONDITION DISCOVERED

### WHY ADDITIONAL WORK IS REQUIRED

### ADDITIONAL SCOPE

### PRICE IMPACT

### SCHEDULE IMPACT

### CUSTOMER DECISION / APPROVAL REQUIRED

### DOCUMENTATION TO ATTACH

Keep the language factual and professional.

Do not:

- Assign legal liability
- Interpret contract law
- Invent code requirements
- Invent costs
- Claim customer responsibility unless established

Highlight anything requiring management or legal review.
Prompt 28

Handle a Customer Complaint and Find What Actually Failed

Replace each highlighted [field]
Act as both a customer-service manager and process-improvement analyst.

Customer complaint:

[PASTE COMPLAINT]

Relevant job facts:

[FACTS]

Original customer expectation:

[EXPECTATION]

What actually occurred:

[WHAT HAPPENED]

First, identify what is factually known versus what is uncertain.

Then classify the likely problem as one or more of:

- Communication failure
- Scheduling failure
- Expectation mismatch
- Documentation failure
- Work-quality concern
- Employee behavior
- Billing issue
- Scope misunderstanding
- Handoff failure
- Management/process failure
- Unknown / needs investigation

Then provide:

### 1. CUSTOMER RESPONSE

Draft a professional response that:

- Acknowledges the concern
- Does not admit facts that have not been verified
- Does not become defensive
- Explains the next action
- Sets a reasonable expectation for follow-up

### 2. INTERNAL ROOT-CAUSE REVIEW

Identify what may have allowed the problem to happen.

### 3. CORRECTIVE ACTION

Recommend one immediate corrective action.

### 4. PREVENTIVE PROCESS CHANGE

Recommend how the business could reduce the chance of the issue happening again.

### 5. INFORMATION STILL NEEDED

List anything that must be investigated.
Prompt 29

Turn How We Actually Do This Job into an SOP & Closeout Checklist

Replace each highlighted [field]
Act as an operations and process-documentation specialist.

I am going to describe how an experienced employee or owner actually performs this type of work.

Job/process:

[NAME]

Our current process:

[PASTE NOTES OR TRANSCRIPT]

Convert this real-world knowledge into a practical SOP.

Organize it into:

### PURPOSE

### WHEN THIS SOP APPLIES

### PERSON RESPONSIBLE

### REQUIRED INFORMATION BEFORE STARTING

### TOOLS / MATERIALS / SYSTEMS

### STEP-BY-STEP PROCESS

### CUSTOMER COMMUNICATION POINTS

### REQUIRED PHOTOS / DOCUMENTATION

### QUALITY-CONTROL CHECKS

### SAFETY OR TECHNICAL ITEMS REQUIRING QUALIFIED REVIEW

### CONDITIONS REQUIRING MANAGEMENT ESCALATION

### COMPLETION REQUIREMENTS

Then create a separate:

# JOB CLOSEOUT CHECKLIST

The closeout checklist should verify applicable items such as:

- Work completed
- Required photos captured
- Equipment accounted for
- Materials accounted for
- Site cleaned
- Customer updated
- Outstanding work documented
- Change orders documented
- Required paperwork completed
- Invoice information ready
- Follow-up required
- Final approval/confirmation recorded

Do not invent technical procedures that were not provided.

If the employee's explanation skips a critical step, list it as:

**QUESTION / NEEDS VERIFICATION**

rather than filling in the answer yourself.
Prompt 30

Compare Estimated Cost to Actual Job Cost

Replace each highlighted [field]
Act as a contractor job-costing analyst.

I want to compare what we expected a job to cost against what actually happened.

### ESTIMATED

Estimated selling price:

[$]

Estimated labor hours:

[HOURS]

Estimated labor cost:

[$]

Estimated materials:

[$]

Estimated subcontractors:

[$]

Estimated equipment:

[$]

Estimated travel/other:

[$]

Expected gross profit:

[$ OR %]

### ACTUAL

Actual selling price:

[$]

Approved change orders:

[$]

Actual labor hours:

[HOURS]

Actual labor cost:

[$]

Actual materials:

[$]

Actual subcontractors:

[$]

Actual equipment:

[$]

Actual travel/other:

[$]

Callbacks/rework:

[$ OR HOURS]

Actual gross profit:

[$ OR % IF KNOWN]

Compare estimated to actual.

Show variance for:

- Revenue
- Labor hours
- Labor cost
- Materials
- Subcontractors
- Equipment
- Other cost
- Gross profit

Then classify likely causes as:

### ESTIMATING ERROR

### PRODUCTION / EFFICIENCY PROBLEM

### MATERIAL-COST VARIANCE

### SCOPE CHANGE

### UNEXPECTED CONDITION

### CALLBACK / REWORK

### SCHEDULING / TRAVEL ISSUE

### INSUFFICIENT INFORMATION

Identify the three biggest lessons from the job.

Then answer:

**What should we change when estimating or producing the next similar job?**

Do not assume that every cost overrun was an estimating mistake.

AI Can Give You Ideas. MPS Helps Turn Them Into a System.

Where appropriate, MPS can help implement the process, system, website, automation, lead-response, scheduling, marketing, or operational improvement needed to address the problem.

Take the Free AssessmentDownload the PDF